Stitch Weld Callout: How to Read, Write & Apply Intermittent Weld Symbols (AWS A2.4 & ISO 2553)
Learn how to read and write a stitch weld callout: AWS A2.4 length-pitch symbols, chain vs staggered, ISO…
READ ARTICLE →On a busy shop floor, nobody has time to read a paragraph of instructions for every joint. Yet a single fabrication drawing might call for dozens of welds — each with its own type, size, length, and finishing requirement. Get one wrong and the consequences are real: you can weld the wrong side of a joint, undersize a fillet until it fails inspection, or miss a field weld entirely because you didn’t recognize a little flag on the tail.
That’s why welding symbols exist. They compress pages of notes into a few inches of drawing. Every symbol tells you the weld type, its location relative to the arrow, the dimensions, and any supplementary requirements — four essentials, communicated in seconds by someone who knows the shorthand.
The good news is that this shorthand is logical. Once you learn to read a welding symbol from the reference line outward, it stops looking cryptic and starts reading like a sentence.
Before we go further, let’s clear up a distinction that trips up a lot of beginners. In the standard, a weld symbol is just the small shape that names the weld type — a triangle for a fillet, a V for a groove, and so on. A welding symbol is the complete assembly: the arrow, the reference line, the tail, the weld symbol itself, and all the dimensions and supplementary symbols attached to it.
Quick Note: Think of the weld symbol as one word, and the welding symbol as the whole sentence. The triangle alone means little; where it sits on the reference line is what makes it a complete instruction.
Two standards govern how these instructions appear on drawings, and knowing which one you’re looking at is half the battle.
Here’s the catch: the two systems look similar enough to fool you, but they place information differently. That similarity is exactly what causes costly misreads on drawings that cross borders.
Reading weld symbols isn’t just a welder’s skill. Detailers who draw them, fabricators who fit parts to them, inspectors who verify against them, and engineers who specify processes all live in the same language. When everyone reads the drawing the same way, rework drops and quality climbs.
This guide walks through that language step by step. We’ll cover the anatomy of a welding symbol, the arrow-side rule, all the basic weld types, dimensions, supplementary symbols, the AWS-versus-ISO differences, common mistakes, and a repeatable method you can apply to any symbol you meet.
One last thing to keep in mind: shop wall charts and online references are handy aids, but the only complete and official presentation of the standard symbols lives in the standard itself — AWS A2.4. Treat charts as quick reminders, not as the final authority.
Every welding symbol, no matter how intimidating it looks, is built from the same handful of parts arranged in a predictable way. Once you can name each piece and know what it does, the jumble of lines and triangles turns into a sentence you can read left to right. Think of this section as your map: the reference line is the spine, the arrow is the pointer, and everything else hangs off them in specific spots.
In the U.S., these conventions are codified in AWS A2.4, Standard Symbols for Welding, Brazing, and Nondestructive Examination. That standard defines exactly where each element sits, which is why two different fabricators can read the same drawing and arrive at the same weld.
The reference line is a straight horizontal line, and it is always drawn horizontally regardless of how the joint sits on the drawing. This is the anchor of the entire symbol. Weld symbols (the little triangles, V shapes, and squares) are drawn in contact with the reference line, generally at its midpoint.
Dimensions ride along this line too. Size goes to the left of the weld symbol, while length and pitch go to the right. We’ll dig into those numbers later, but for now just notice that the reference line is the shelf that holds everything.
The arrow is a leader line that connects the reference line to the joint to be welded. It has two ends: one touches the reference line, and the other terminates at the location of the weld. An arrowhead indicates the specific side or member that the symbol applies to, and the arrow may connect to either end of the reference line.
Some symbols use a broken arrow with a bend, which is just a way to reach a joint that’s tucked behind other geometry. The arrow always points where the work happens, so it pays to trace it carefully before you strike an arc.
Quick Note: The arrow and the reference line are the only required elements of a welding symbol. Everything else is added only when it’s needed.
The tail is drawn as a greater-than or less-than symbol at the end of the reference line opposite the arrow. It’s optional, and it’s omitted entirely when there’s nothing to reference.
When it is used, the tail holds supplementary information that tells you how to make the weld:
This is where a drawing stops being generic and becomes specific to a shop. If the tail says “GMAW,” you’re reaching for a wire feed process, and it may be worth understanding how that differs from similar methods. For a quick comparison, see flux core vs. MIG. If it names GTAW on aluminium, the current matters enormously, which is why DC welding aluminium is covered separately. And when the tail references a heavy automated process like SAW, the trail leads to robotic submerged arc welding.
Here’s the mental diagram that will carry you through the rest of this guide. Picture reading from the arrow outward:
| Element | Required? | What It Tells You |
|---|---|---|
| Arrow | Yes | Which joint, and which side |
| Reference line | Yes | Holds the weld symbol and dimensions |
| Weld symbol | Usually | The type of weld (fillet, groove, etc.) |
| Dimensions | As needed | Size, length, pitch, angle |
| Supplementary symbols | Optional | All-around, field, contour, finish |
| Tail | Optional | Process, WPS, spec, or note |
One detail worth flagging for anyone working to current U.S. standards: AWS A2.4:2020 revised several elements, including changing how spot and seam weld strength is designated. That strength must now be specified as a note in the tail rather than as a number on the symbol. It’s a reminder that the tail isn’t just decoration; it carries real, binding information.
With this framework in hand, the next question is the one that trips up more readers than any other: which side of the line does the weld go on?
If you remember only one thing from this entire guide, make it this: the arrow tip tells you which side of the joint is the arrow side. Everything else in the symbol falls into place once you know that.
The arrow points at one face of the joint. That face is the arrow side. The face directly opposite it is the other side. On a T-joint, the arrow touches either the vertical stem or the horizontal plate — whichever face the tip lands on becomes the arrow side, and the opposite one becomes the other side. It sounds almost too simple, but this single detail decides where metal actually gets deposited.
Here’s where beginners get tripped up. The direction the arrow points, and whether the tail sits on the left or the right, don’t change the rule at all. What matters is where the weld symbol sits relative to the reference line.
That’s the whole convention under AWS A2.4, and it holds no matter which way the arrow rotates. Flip the arrow to the other plate and the geometry flips with it, but “below means arrow side” never changes. This is why welders who memorize pictures instead of the rule weld the wrong face the moment a drawing rotates the joint.
Think of it like a mailing address. The arrow is the street address — it tells you where the message is going. The line position tells you what to do when you arrive. Fixating on the arrow’s direction, up or down, left or right, is like ignoring the envelope and reading only the address.
This matters most on asymmetric joints where the two faces aren’t equivalent. On a lap joint or a corner joint, welding the arrow side versus the other side produces a completely different connection, and getting it wrong can leave the load-bearing member unwelded entirely. When you’re checking a critical fit-up, it pays to confirm the joint type and side against a reference like our lap weld joint guide before you strike an arc.
Quick Note: Stand at the arrow side and picture yourself looking at the joint. The face nearest your eyes is the arrow side; the face pointing away is the other side. That mental trick resolves almost every side question on the shop floor.
ISO 2553 handles sides differently, and this is where cross-trained welders get burned. Instead of one reference line, ISO System A uses a dual reference line: a continuous line paired with a dashed line, which the standard calls the identification line.
Here’s the catch: the dashed line can be drawn above or below the continuous line, and it still means the same thing. You read the line style, not the vertical position. That’s a real departure from AWS, where simply moving a symbol across the single line completely changes the weld location.
ISO System B, by contrast, uses a single reference line and works much like AWS: a symbol below the line is the arrow side. According to the 2019 edition of ISO 2553, the drawing must state clearly which system is used, including the units of measurement, so there’s no guesswork about which convention applies.
Because both systems can appear across different drawings in the same shop, always check the title block or general notes before you assume which convention you’re reading. One glance at the notes can save you from welding an entire joint on the wrong face.
Every welding symbol you’ll ever meet starts with one question: what kind of weld is this? The symbol itself is just a shape sitting on the reference line, and that shape tells you the joint type. According to AWS A2.4:2020, there are 16 weld type symbols in total. You won’t need all of them every day, but recognizing the whole family keeps you from freezing on an unfamiliar drawing.
The fillet is the symbol you’ll see most, and for good reason. In structural steel fabrication, it’s by far the most common weld type. The symbol is a right triangle with the perpendicular leg on the left and the hypotenuse sloping down to the right. That shape sits on the reference line, and when dimensions appear to its left, they give the leg size.
Fillet welds join two surfaces meeting at roughly 90 degrees, and they need no edge preparation. That’s why they’re fast and economical. Think of a lap joint or a T-joint, like the ones covered in a lap weld joint guide — the triangle simply says “run a fillet here.”
Quick Note: The perpendicular leg of the fillet triangle is always on the left. If you see it flipped, you’re reading it upside down — a common rookie slip on rotated drawings.
Groove welds fill a prepared opening between two abutting members. They take more prep but deliver higher strength. AWS defines seven groove types, plus the flare variations. Here’s the lineup:
On bevel and J grooves, it matters which member gets the preparation. That’s where the broken, or jogged, arrow comes in. The arrow is bent toward the member that receives the beveled or J-shaped edge. When the preparation is symmetrical or doesn’t matter, the arrow stays straight. This tiny kink is one of the easiest details to overlook, so train your eye to check it before you cut anything.
Beyond fillet and groove, you’ll run into these:
Groove welds carry a penetration qualifier. A Complete Joint Penetration (CJP) weld fuses through the full thickness and is designed to match the base metal’s strength. A Partial Joint Penetration (PJP) weld penetrates only part of the joint thickness, so it’s weaker than the base metal but cheaper to make. The depth is written as a dimension and it changes everything about procedure, cost, and inspection.
| Factor | Fillet Weld | Groove Weld |
|---|---|---|
| Edge prep | None | Usually required |
| Strength | Good | Higher (CJP matches base) |
| Speed/cost | Fast, cheap | Slower, pricier |
| Typical use | Lap and T-joints | Butt joints, full-strength demands |
Rule of thumb: reach for a fillet when the joint allows it and the load permits, and step up to a groove weld when you need full penetration or a flush, full-strength connection. Knowing which symbol you’re looking at is the first real decision on any drawing.
Numbers don’t drift around a weld symbol at random. Every dimension has a fixed address, and where it sits tells you exactly what it measures. Learn the addresses once and the whole symbol reads like a sentence: size on the left, length and pitch on the right, joint prep tucked into the symbol itself.
The weld size is always placed to the left of the weld symbol, on the same side of the reference line. Length and pitch go to the right. That one convention answers most of the “what does this number mean?” questions you’ll ever face on a drawing.
For a fillet, the left-hand number is the leg length — the same measure that governs strength on a simple lap weld joint. For a groove weld, the left-hand number describes the depth of preparation. The right side is reserved for how far and how often the weld runs.
Groove welds carry two extra dimensions. The root opening sits inside the groove symbol — the small gap drawn between the beveled edges. This is the space left for root penetration. The groove angle sits beyond the open end of the symbol, outside the bevel, showing how wide the included angle opens. Get these two right and your fit-up matches the engineer’s intent; get them wrong and you’ll fight penetration all day.
AWS dimensions groove welds with a two-part notation, S (E), where S is the depth of bevel and E is the weld size in parentheses. So 1/2 (3/8) means a 1/2-inch depth of bevel with a 3/8-inch weld size. The parentheses matter — they separate preparation depth from actual weld size, and it’s a distinction welders new to AWS A2.4 often skip.
Quick Note: Read every dimension by its address: size left of the symbol, length and pitch to the right, root opening inside the groove, groove angle beyond the bevel. Miller’s guide to reading and understanding weld symbols reinforces that same left-right discipline.
In AWS notation, an intermittent weld is written length-pitch. 2-6 means 2-inch weld segments on 6-inch centers — pitch measured center to center. When no length is given, the weld runs the full length of the joint.
Intermittent welds come in two layouts:
ISO 2553 writes intermittent welds differently: n × l (e), where n is the number of segments, l is the length of each, and e is the clear space from the end of one segment to the start of the next. That last part trips people up. ISO pitch is the clear gap, not center-to-center, so total pitch equals l + e. A 2-6 weld in AWS is not the same as “2 × 100 (100)” in ISO until you do the arithmetic.
Both systems share the same logic, but ISO 2553 shifts the reference points — one reason mixing the two standards silently creates errors.
Here’s the quiet error that ruins welds: AWS dimensions a fillet by leg length, while ISO normally uses the design throat, written a. The same number in the two systems describes a different weld. ISO marks throat with the letter a and leg with z; AWS leaves the letter off and assumes leg for fillets.
For an equal-leg fillet, throat ≈ 0.707 × leg length. A 1/4-inch leg gives roughly a 4.5 mm throat. So a fillet sized by leg in AWS and one sized by throat in ISO can’t be compared by the number alone — check the standard block before you weld.
A properly sized fillet also shows up in the finished bead. If you want a visual check on technique, good and bad MIG welds is a useful cross-reference before you trust your leg measurement.
Not every symbol on a drawing tells you what kind of weld to make. Some simply modify a weld that’s already defined, adding instructions about where it goes, how the face should look, or how it’s supported at the root. These supplementary symbols are small, but ignoring one can send a job sideways fast.
A circle sitting at the junction of the arrow and reference line is the weld-all-around symbol. It means the weld continues around the entire perimeter of the joint rather than stopping at one edge. On a tube-to-plate or a box section, that circle is your cue to keep welding past the corner and close the loop.
A solid flag at that same junction is the field weld symbol. It tells you the weld must be made at the erection or installation site, not in the shop. That single flag reshapes the whole job: inspection gets scheduled on-site, preheat and weather protection become real logistics, and portable equipment has to travel. If you catch a field flag late, you may have already fabricated a piece you can’t ship. For teams scaling up, planning that site work is a lot like the groundwork covered in welding facilities setup — power, access, and safety all have to be arranged before anyone strikes an arc.
Quick Note: Older drawings may show a filled-in circle at the junction to mean field weld. Treat it the same as the flag — that weld happens on site.
Contour symbols describe the finished face of the weld. A straight line means flush, an upward arc means convex, and a downward arc means concave. These aren’t cosmetic details — a concave fillet changes how stress flows through a joint, and a flush face may be required where a mating part seats.
Finish symbols tell the welder how to reach that contour mechanically:
When you see a contour mark paired with a finish letter, the sequence matters: weld first, then process the face to the required profile. Both contour and finish requirements affect fit-up and post-weld processing, so they belong in your planning, not as an afterthought once the joint is cool.
Back and backing welds share the same symbol and are drawn opposite the groove weld they support. The difference is timing: a backing weld is deposited before the main groove weld, while a back weld is deposited after. A tail note or a second reference line tells you which order applies. Get this wrong and you’ll either seal a joint you meant to leave open or chase a root you should have backed first.
Related root-side symbols include backing bars, spacers, and consumable inserts. The consumable insert is drawn as a filled square sitting in the root of a groove weld symbol — it melts into the joint to help guarantee full penetration. Backing and spacers are shown as rectangles on the opposite side. On thick, high-deposition work, these root details pair naturally with processes like robotic submerged arc welding.
The melt-through symbol indicates weld metal that fuses through the root to the far side, giving visual proof of penetration without a full back weld. These conventions come from the AWS standard, so checking the AWS A2.4 symbol standard settles any doubt.
Read together, these modifiers turn a bare weld type into a complete instruction: where it goes, how the face must finish, and how the root is supported.
Cross a border with a set of fabrication drawings and the rules quietly change beneath your feet. The United States runs on AWS A2.4, while most of the rest of the world follows ISO 2553. The two standards agree on roughly 80 percent of their symbology, and that overlap is exactly what makes the differences dangerous. When a symbol looks familiar, you stop double-checking it — and that’s where wrong-side and undersized welds get born. Knowing where the two part ways is the fastest way to keep a mixed stack of drawings from turning into rework, scrap, or a failed inspection.
| Feature | AWS A2.4 | ISO 2553 (System A) |
|---|---|---|
| Reference line | Single line | Solid line + dashed identification line |
| Fillet size | Leg length only | Throat (a) or leg (z) |
| Intermittent welds | Length-pitch | n × l (e) |
| Tail contents | Process abbreviations | EN ISO 4063 numbers |
An AWS symbol rides on a single reference line. Whatever sits below it applies to the arrow side; whatever sits above applies to the other side. ISO changes the scaffolding. Under ISO 2553, System A pairs a solid continuous line with a dashed identification line, and the placement of that dashed line is what fixes the two sides. Read an ISO symbol with AWS habits and you can confidently weld the wrong face of the joint — the single most common cross-standard error. The dashed line often sits on the opposite side of the solid line from where AWS would place its symbol, so the entire drawing reads upside-down to anyone trained on A2.4.
Quick Note: Before you read a single symbol, confirm which standard governs. If the title block doesn’t say, ask. Guessing between A2.4 and ISO 2553 is how welds land on the wrong side.
This difference costs real money. AWS dimensions a fillet by leg length. ISO can specify either throat thickness (a) or leg length (z). So “a6” means a 6 mm throat — which works out to roughly an 8.5 mm leg, not a 6 mm leg. Treat an ISO throat callout as an AWS leg callout and you’ll deposit a fillet about 30 percent undersized, with a corresponding drop in strength. The mismatch compounds on thin material, where a throat-to-leg miscalculation can also push you toward burn-through or excessive convexity. Always check whether the letter is a or z.
ISO writes intermittent welds as n × l (e): number of welds, length of each, and the gap between them. AWS uses length-pitch, where the pitch is the center-to-center distance. The same physical weld therefore carries different numbers on the two systems, because ISO’s e is a clear gap while AWS’s pitch is center-to-center. Mismatch the two and you’ll space welds incorrectly across the whole run.
The tail is where process information lives. AWS uses abbreviations such as GMAW, SMAW and FCAW — worth recognizing, since filler selection often follows directly from that callout. ISO uses EN ISO 4063 classification numbers instead, so GMAW becomes 131 and MMAW becomes 111. If you’re reading a numeric tail expecting a mnemonic, slow down and translate.
ISO 2553 actually contains two conventions. System A, the familiar dual-line approach, is the international default. System B is a single-line variant closer to AWS. Because the two can look almost identical, the 2019 revision now requires the applicable system to be stated on the drawing. That single note removes most of the ambiguity — but only if someone actually checks it.
The takeaway is simple: read the title block first, find the governing standard, and note the system before you interpret a single symbol. The AWS A2.4 standard and ISO 2553 each make perfect sense on their own terms — mixing them is what breaks drawings.
Even experienced welders misread symbols, and the bill shows up as rework, rejected parts, and lost time. Most errors trace back to a handful of repeat offenders. Learn to spot them and you will catch problems before the arc strikes.
Standards are not interchangeable. The American system is governed by ANSI/AWS A2.4, while ISO 2553 rules international work. A drawing marked to ISO that a shop interprets per AWS can send welds to the wrong side of the joint, a familiar failure on international projects where both systems appear in the same package.
Prevention: read the title block and general notes first, then match your interpretation to the standard cited. Quick check: does the drawing reference A2.4 or ISO 2553? If it is ISO, expect the dual a and z sizing system rather than AWS leg-only numbers.
Quick Note: The fastest safeguard is the title block. Verifying the governing standard from the drawing’s title block is the single most effective way to avoid symbol misinterpretation.
ISO uses a for throat thickness and z for leg length. AWS typically dimensions a fillet by leg alone. Confusing the two has produced undersized fillet welds that pass a visual inspection but fail under load. This guide to telling good welds from bad ones shows what a proper profile should look like.
Prevention: identify whether the governing letter describes throat or leg, then convert before you set travel speed. Quick check: can you state in one sentence whether the number is throat or leg? If not, stop and ask.
The arrow side/other side rule trips people up when symbols stack above and below the reference line. Get it backwards and you deposit metal on a face that was never designed to carry it. Prevention: trace each symbol to its line position before tacking. Quick check: point at the member and say aloud which side the arrow touches. On a lap weld joint, that discipline keeps the weld on the intended face.
The flag tells you the weld happens at the site, not in the shop. Miss it and a subassembly ships fully welded, arriving where it cannot be installed. Prevention: scan every symbol for the flag before planning fit-up. Quick check: flag present or absent? If present, schedule field labor and a mobile setup, as covered in this guide to planning a safe welding shop.
Both sit at the junction of the arrow and reference line, which is exactly why they get swapped. The circle means weld all around the joint; the flag means weld in the field. Prevention: name each element aloud as you read the symbol. Quick check: is that shape a circle or a triangular flag? One changes extent, the other changes location.
On bevel and J grooves, a broken arrow signals which member of the joint gets prepared. Ignore it and you will bevel the wrong plate, wasting material and machine time. Prevention: confirm which member the arrow points to and which side of the line carries the groove symbol. Quick check: is the arrow straight or broken, and where does the groove symbol sit?
Pitch combines weld length with center-to-center spacing. Reading pitch as weld length alone leaves gaps that are too long or too short, weakening the joint. Prevention: separate the two numbers before marking the metal. Quick check: two numbers separated by a dash mean length then pitch, not two lengths.
None of these mistakes need exotic knowledge to fix. They need a routine: identify the governing standard, pull the WPS and process details, and confirm your interpretation before touching the workpiece. That sequence alone prevents most costly failures, whether you are running a simple fillet pass or a high-deposition robotic submerged arc setup.
A symbol on a print can carry six or seven pieces of information at once, and trying to absorb it all at a glance is how mistakes happen. The fix is to stop reading symbols as a picture and start reading them as a sentence — left to right, in a fixed order. Use the same five-step routine every time and nothing slips past you.
Quick Note: The arrow, reference line, and tail used for nondestructive examination symbols carry the same significance as those used for welds — so this same reading order applies.
Picture a right triangle sitting below the reference line. To its left is 3/8, and to its right is 3-12. Read it in order. The triangle means fillet. Below the line means arrow side. So: a 3/8-inch intermittent fillet weld on the arrow side, made in 3-inch segments spaced on 12-inch centers.
The 3/8 is the leg size; the 3-12 is length and pitch. That gap of 9 inches between segments matters — the drawing is telling you not to run a continuous bead. Notice how position, not decoration, does all the work: 3/8 to the left of the triangle is size, 3-12 to the right is length and pitch. Change either number and the weld changes completely.
The tail is where drawings park information that does not fit neatly into the symbol. The classic example is a reference to an approved Welding Procedure Specification (WPS), since the WPS can contain every detail for that specific joint — process, filler, polarity, and travel speed. If you see a WPS number, stop and pull the document. Polarity questions, for instance, are answered there rather than on the symbol; our guide to polarity for flux core welding shows why DCEN and DCEP are not interchangeable.
A clean, well-lit bench and a proper setup make this easier; see our guide to planning and setting up a safe shop. And whatever the symbol calls for, protect your eyes with the right protective eyewear. For heavy deposition work where symbols often pair with automation, robotic submerged arc welding is worth understanding. When in doubt, ask before you strike an arc; a two-minute question always costs less than a cut-out.
Weld symbols reward the welder who slows down and reads them properly. Get them right and you place the weld on the correct side, at the correct size, finished to the correct contour. Get them wrong and you pay twice: once to grind out the mistake, again to re-weld and re-inspect it. Reading symbols correctly supports correct weld placement, sizing, and finishing, and that is what keeps rework and inspection failures off your punch list.
The good news is that the language is smaller than it looks. The arrow, the reference line, and the tail form the backbone of every welding symbol, whether the drawing follows AWS A2.4 or ISO 2553. Once those three anchors are clear in your head, the rest is detail you can decode with a quick reference chart.
If you remember only a few things from this guide, make them these:
Quick Note: Fluency benefits everyone on the job — welders, inspectors, detailers, and fabricators — because a symbol understood the same way by all four keeps the fabrication and erection process moving without guesswork.
Skill here is built, not inherited. Keep comparing drawings against the standard — the AWS A2.4 standard for US work and ISO 2553 for international projects. Study the WPS alongside the drawing so the symbol and the actual procedure line up in your mind. Treat every symbol as a sentence read from the reference line outward, because that habit turns a page of triangles and flags into plain instructions.
Fit-up is where this pays off before the arc even strikes. When you can read a symbol at a glance, you know how much gap to leave and whether the far side needs preparing — our lap weld joint guide shows how joint type drives technique.
Symbol literacy is the line between a competent welder and a confident, code-capable professional. Keep the charts handy, keep reading drawings against the standards, and the shorthand will keep paying you back — in cleaner welds, fewer callbacks, and work that passes inspection the first time.
A weld symbol is just the small geometric shape that names the weld type, such as the fillet triangle or the V-groove. A welding symbol is the complete assembly: the arrow, reference line, weld symbol, dimensions, tail, and any supplementary symbols. AWS A2.4 defines this distinction explicitly.
The arrow tip points to the ‘arrow side.’ In AWS A2.4, a weld symbol below the reference line means weld the arrow side, and above the line means the other side. On ISO System A drawings, the side is set by whether the symbol sits on the solid or dashed line, not by above or below.
A solid flag at the junction of the arrow and reference line is the field weld symbol, meaning the weld must be made on site during erection rather than in the fabrication shop. Older drawings sometimes show this as a filled black circle instead.
A circle is the weld-all-around symbol, meaning the weld continues around the entire perimeter of the joint, such as all four sides of a tube-to-plate connection. It is easily confused with the field weld flag, which is a solid triangle at the same location.
AWS A2.4 uses a single reference line where below the line is the arrow side. ISO 2553 System A uses a solid reference line plus a dashed identification line to define the two sides. They also differ in fillet sizing (leg in AWS, throat or leg in ISO) and intermittent weld notation.
In AWS A2.4 the number to the left of the fillet symbol is the leg length. In ISO 2553 a number preceded by ‘a’ is the throat thickness and one preceded by ‘z’ is the leg length. For an equal-leg fillet the throat is roughly 0.707 times the leg, so the two are not interchangeable.
In AWS notation, 3-12 means 3-inch weld segments placed on 12-inch centers (center-to-center pitch). No length value means the weld runs the full length of the joint. ISO uses a different format, n × l (e), where the last number is the clear gap between segments.
A straight line means the weld face is finished flush, an upward arc means convex, and a downward arc means concave. A letter alongside indicates the finishing method, such as G for grinding, M for machining, or C for chipping.
Check the title block and general notes, which should name the governing standard and units. The visual clue is the reference line: a single solid line suggests AWS A2.4 or ISO System B, while a solid line paired with a dashed identification line means ISO 2553 System A.
It goes in the tail of the welding symbol. The tail typically holds the welding process abbreviation (such as GMAW or SMAW in AWS, or an EN ISO 4063 number in ISO), a WPS number, a specification, or a note. If there is nothing to reference, the tail is omitted.